Powered By Kitlog Pro v2.0
THOMAS'S WEB SITE
Cherry BX-2
Horizontal Stab.
4-21-2016
< Previous Log Entry
Next Log Entry >
Date:
4-21-2016
Number of Hours:
2.00
Manual Reference:
Brief Description:
Optional Bushing
I had to polish the steel that turns inside the delrin a little more to have the bearing work just with the right friction and resistance. Thereafter I manufactured two capsules (D44 Part 2) from EN AW 6082 T6 and pressed it into the scuare tube.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cherry BX-2 Home
Category
# Logs
# Hours
All
482
4021
Avionics/Instrument
8
12
Electrics/Instrument
8
12
Engine
63
176
Fuselage
151
306
Horizontal Stab.
32
68
Miscellaneous
1
2
Prebuilding Hours no
1
3000
Projectinspection
5
10
Prop
12
42
Retractable Gear
97
252
Seating
14
21
Stand
4
15
Tank
60
52
Vertical Stabilizer
19
43
Wing Loading Test
4
10
Workshop
3
Copyright © 2001-2024 Matronics. All Rights Reserved.